Castleberry ISD is having a bond election.

Learn more about what’s included in the district’s $98,000,000 bond package below.

Why is Castleberry ISD having a bond election?

New Construction: 

  • Building STEM Science Classrooms and Labs

  • Eliminating Portables and Providing State of the Art Career and Technical Education Classrooms

  • Centralizing Administration Offices

  • Meeting building compliance by adding a Storm Shelter Gymnasium

  • Interior “Connector” between Basement and existing Gymnasium

  • Securing Outside Areas for Students such as Gated Parking and Exterior Plaza Spaces

  • Providing Collaboration Areas for Students

Renovations:

  •  Enlarging Existing Classrooms to Meet TEA Standard of 800 Square Feet

  • Opening the Library to Support Flexible Learning Spaces and Additional Dining Spaces

  • Creating a Functional Education Learning Environment Area with ADA Access

  • Demolishing the Existing Open Exterior Connector and Building New Enclosed Connector

  • Remodeling the Existing Fine Arts and Theatre Areas to Increase Storage and Dressing Room Space

In order to comply with the Texas Education Agency standards, CISD must renovate existing facilities to accommodate students with the adequate space for learning. All projects are included below:

Overall CHS Campus

To view more renderings, click the button below.

Castleberry ISD lowered the total tax rate by $0.2354 from 2022-2023.

How will this bond affect my taxes?

Upcoming Events

Stay informed on all things Castleberry ISD May 2024 Bond Events!